(2) Rainwater utilization
The first cistern for using rainwater was built back in 2000 as part of a school project (cherry tree meadow in front of House C). Step by step and where possible, we have extended the integration. The aim is to use most of the rainwater and to allow any rainwater that is not used to seep into the groundwater on the site.
Our concrete measures:
- Cistern in the meadow in front of House C (since 2000): filled from the front of House C, lawn watering via manual extraction using an electric pump.
The overflow seeps into a small pit in the sand on the sports field. - Cistern in the courtyard at Marienallee 5 (since 2006): filled from the roof and path areas of House B for watering the school garden at Marienallee 5.
- Rainwater barrels next to House I (gymnasium): 2 x 3000 liters for watering the school garden
(3) Rainwater infiltration
House B / House H (courtyard): since 2014, seven soakaways have prevented soil erosion in the direction of the sloping terrain towards Prießnitzpark and drainage into the sewer system. The excess, unused rainwater seeps through the natural sands into the groundwater on the school grounds.
Our concrete measures:
- House A, C, G, H, Übschule: Roof insulation with blow-in materials made from renewable raw materials (isofloc© or similar)
- House C: Interior wall insulation with cork
- Paints: Use of ecological glazes
- Floor coverings: Parquet floors sanded, oiled, not varnished, use of natural cork / linoleum (100% from organic / mineral raw materials) for new installations (from 1994)
(5) Heating / heating control
Our specific measures:
- House A: Replacement of gas boiler, hydraulic balancing (optimized coordination of the heating system: radiators, thermostatic valves, pumps, pipes), preparation for the use of heat pumps, dismantling of the central water heating system (2023)
- House B: wood chip firing system since 2006, supplied by local producer (waste wood from Saxony and Brandenburg)
- House B (connector): Regulation of the room climate via automatic window control and underfloor heating
- House C (wall heating), D, E, H: individual room/utility unit control
(6) Energy saving
In connection with soundproofing measures in the classrooms or the installation of false ceilings in the corridors as well as general refurbishments, LED lighting has been installed since 2017. In future, motion detectors will also help to illuminate the corridors in a more energy-efficient way.
Our specific measures:
- Windows (all buildings, gradual implementation in connection with major renovation measures): Installation of wooden windows with thermal glazing, some with additional solar control glazing
- Lighting (all buildings, gradually): Conversion to LED light sources, reduction in energy consumption to approx. 33% compared to 2000.